Equinix Data Center IL2 & IL4
5 sets of QSK-60 2500 ekW diesel engine system manufacture and erection.
Client: Cummins Turkey Motor ve Güç Sistemleri
Location: İstanbul – Türkiye
Year: 2023
Swissôtel Grand Efes İzmir
1 set CAT 2MW gas engine erection.
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İzmir – Türkiye
Year: 2023
Sakarya Gas Field Development Project
3 sets of Jenbacher J624 4498 ekW gas engine package manufacture and erection.
Client: TOPKAPI ENDÜSTRİ A.Ş.
Location: Zonguldak – Türkiye
Year: 2022
Swissôtel Grand Efes İzmir
1 set CAT 2MW gas engine disassembly works.
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İzmir – Türkiye
Year: 2022
İzmir Adnan Menderes Airport
1 set CAT 2MW gas engine disassembly works.
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İzmir – Türkiye
Year: 2022
TAI Subsonic Wind Tunnel
1 set of MTU 12V4000 Gx4 1250 ekW Dynamic UPS diesel engine manufacture and erection.
Client: MTU Motor Türbin A.Ş.
Location: Ankara – Türkiye
Year: 2022
Equinix Data Center IL2
1 set of QSK-60 2500 ekW diesel engine system manufacture and erection.
Client: Cummins Turkey Motor ve Güç Sistemleri
Location: İstanbul – Türkiye
Year: 2022
Alperteks Cogeneration System
Erection of 1 Set MTU 20V4000L64 FNER 2538 gas engine, manufacture and erection of 3 sets heat recovery system and waste heat recovery boiler.
Client: MTU Motor Turbin A.S.
Location: Usak – Turkey
Year: 2021
ESA Grup Enerji Biogas Power Plant
Erection of 3 Set Jenbacher JMS-420 biogas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: Esa Grup Enerji
Location: Eskisehir – Turkey
Year: 2021
ESA Grup Enerji Biogas Power Plant
Erection of 2 Set Jenbacher JMS-420 biogas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: Esa Grup Enerji
Location: Ankara – Turkey
Year: 2021
ESA Grup Enerji Biogas Power Plant
Erection of 2 Set Jenbacher JMS-420 biogas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: Esa Grup Enerji
Location: Kayseri – Turkey
Year: 2021
ESA Grup Enerji Biogas Power Plant
Erection of 2 Set Jenbacher JMS-420 biogas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: Esa Grup Enerji
Location: İzmir – Turkey
Year: 2021
Beypiliç Yem Cogeneration System
Erection of 1 Set MWM TCG3016 V12 600 kWe gas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: Topkapı Endüstri A.Ş.
Location: Ankara – Turkey
Year: 2020
Beypiliç Kesimhane Cogeneration System
Erection of 2 Set MWM TCG2032 V16 4300 kWe gas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: Topkapı Endüstri A.Ş.
Location: Bolu – Turkey
Year: 2020
ESA Grup Enerji Biogas Power Plant
Erection of 2 Set Jenbacher JMS-320 biogas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: Esa Grup Enerji
Location: Manisa – Turkey
Year: 2020
KD Gübre
Erection of 1 Set MWM CG170-20 1560 ekW biogas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
İltekno Mühendislik Ticaret A.Ş.
Location: Eskişehir – Turkey
Year: 2019
ESA Grup Enerji Biogas Power Plant
Erection of 2 Set Jenbacher JMS-320 biogas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: TOPKAPI ENDÜSTRİ A.Ş.
Location: Manisa – Turkey
Year: 2019
ARF Enerji Biogas Power Plant
Erection of 1 Set GEJenbacher JMS-312 and 4 Set GEJenbacher JMS-320 biogas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: TOPKAPI ENDÜSTRİ A.Ş.
Location: Ödemiş / İzmir – Türkiye
Year: 2018
Maritaş Tekstil Cogeneration System
Erection of 1 Set MWM CG260-16 1560 ekW gas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Kahramanmaraş – Türkiye
Year: 2018
ESA Grup Enerji Biogas Power Plant
Erection of 3 Set GEJenbacher JMS-320 biogas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: TOPKAPI ENDÜSTRİ A.Ş.
Location: Sincan / Ankara – Türkiye
Year: 2018
AHİ Enerji Biogas Power Plant
Erection of 2 Set GEJenbacher JMS-320 ve 3 Set GEJenbacher JMS-420 biogas engine, manufacture and erection of heat recovery system
Client: TOPKAPI ENDÜSTRİ A.Ş.
Location: : Suluova / Amasya – Türkiye
Year: 2018
Ve-Ge Kağıt Cogeneration Plant
Erection of 1 Set GEJenbacher JMS-620 gas engine, manufacture and erection of heat recovery system
Client: TOPKAPI ENDÜSTRİ A.Ş.
Location: Kemalpaşa / İzmir – Türkiye
Year: 2018
Midaş Tekstil Cogeneration System
Erection of 1 Set MWM CG260-16 4300 ekW gas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Kahramanmaraş – Türkiye
Year: 2015
Matesa Tekstil Cogeneration System
Erection of 4 Set MWM CG260-16 4300 ekW gas engine, manufacture and erection of heat recovery system and waste heat recovery boiler
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Kahramanmaraş – Türkiye
Year: 2015
TAI Cogeneration System
Erection of 4 Set MTU 2145 ekW gas engine, manufacture and erection of 16 barg heat recovery system and D-Type (steam and superheated water) waste heat recovery boiler
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Ankara – Türkiye
Year: 2014
Sabiya Power Plant Black Start System
6 set MTU 20V4000 2500 ekW diesel engine manufacture and erection.
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Sabiya – Kuwait
Year: 2014
Boufarik Power Plant Black Start System
7 set MTU 16V4000 2024 ekW diesel engine manufacture and erection.
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Boufarik – Algeria
Year: 2014
Medicana Hastanesi Cogeneration System
Erection of 1 Set MTU 849 ekW gas engine, manufacture and erection of heat recovery system
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Konya – Türkiye
Year: 2012
Acıbadem Hastanesi Cogeneration System
Erection of 3 Set MTU 849 ekW gas engine, manufacture and erection of heat recovery system
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Eskişehir / Kayseri / Adana – Türkiye
Year: 2012
Konya Şeker Cogeneration System
Erection of 1 Set MTU 1560 ekW gas engine, manufacture and erection of heat recovery system
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Konya – Türkiye
Year: 2011
Dr. Ahmet Hasyanesi Cogeneration System
Erection of 1 Set MTU 849 ekW gas engine, manufacture and erection of heat recovery system
MTU MOTOR TÜRBİN A.Ş.
Yer: İstanbul – Türkiye
Yıl: 2011
Başyazıcıoğlu Tekstil Cogeneration System
Erection of 1 Set MTU 2145 ekW gas engine, manufacture and erection of heat recovery system
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Kayseri – Türkiye
Year: 2011
Gümüştaş Madencilik Cogeneration System Sistemi
Erection of 1 Set MTU 2145 ekW gas engine, manufacture and erection of heat recovery system
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Gümüşhane – Türkiye
Year: 2010
Saray Halı Cogeneration System
Erection of 2 Set MTU 2145 ekW gas engine, manufacture and erection of heat recovery system
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Kayseri – Türkiye
Year: 2010
Selva Makarna Cogeneration Unit
Erection of 1 Set MTU 2145 ekW gas engine, manufacture and erection of heat recovery system
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Konya – Türkiye
Year: 2010
Hilton Hotel Cogeneration System
Erection of 1 Set MTU 1286 ekW gas engine, manufacture and erection of heat recovery system
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Bursa – Türkiye
Year: 2010
Durum Gıda Cogeneration System
Erection of 1 Set CAT 3516C gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Mersin – Türkiye
Year: 2010
Orkide Yağ Factory Cogeneration System
Erection of 1 Set CAT 3516C gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İzmir – Türkiye
Year: 2010
Naksan Tekstil Cogeneration System
Erection of 4 Set CAT 3520C gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Gaziantep – Türkiye
Year: 2009
Melike Tekstil Cogeneration System
Erection of 1 Set CAT 3516C gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Gaziantep – Türkiye
Year: 2009
Konya Şeker Cogeneration System
Erection of 1 Set CAT 3520C gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İstanbul – Türkiye
Year: 2007
Botaş Cogeneration System
Erection of 1 Set CAT 3520C gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Çorlu/Tekirdağ – Türkiye
Year: 2007
Polat Hotel Cogeneration System
Erection of 1 Set CAT 3516C gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İstanbul – Türkiye
Year: 2007
Mauri Maya Fabrikası Cogeneration Units
Erection of container type 2 Set CAT 3520C gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Bandırma / Bursa – Türkiye
Year: 2007
Pepsi Cola Cogeneration Units
Erection of container type 2 Set CAT 3520C gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Kazakistan
Year: 2007
Ormed II Cogeneration System
Erection of container type 5 Set CAT 3520C gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Kazakistan
Year: 2007
Kurtoğlu Alüminyum Cogeneration System
Erection of 2 Set CAT 3516B gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Çorlu / Tekirdağ – Türkiye
Year: 2006
Mardan Palace Cogeneration Units
Erection of container type 2 Set CAT 3516B gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Antalya – Türkiye
Year: 2006
Kilsan Tuğla Cogeneration System
Erection of 2 set CAT 3516C gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İstanbul – Türkiye
Year: 2006
Four Seasons Hotel Cogeneration System
Erection of 1 set CAT 3516B gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İstanbul – Türkiye
Year: 2006
Coca–Cola Cogeneration System
Erection of 2 set CAT 3520 gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Kazakistan
Year: 2006
Conrad Hotel Cogeneration System
Erection of 1 set CAT 3516C gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İstanbul – Türkiye
Year: 2005
Eroğlu Tekstil Cogeneration System
Erection of 1 set CAT 3516B gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Çorlu / Tekirdağ – Türkiye
Year: 2005
Küçükçalık Tekstil Cogeneration System
Erection of 4 set CAT 3520 gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Bursa – Türkiye
Year: 2005
Mercedes Benz Cogeneration System
Erection of 4 set CAT 3520 gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İstanbul – Türkiye
Year: 2004
Baydemir Tekstil Cogeneration System
Erection of 3 set CAT 3520 gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İstanbul – Türkiye
Year: 2004
Çelik Halat Cogeneration System
Erection of 2 set CAT 3516B gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Kocaeli – Türkiye
Year: 2003
Tenghiz Chevron Oil Cogeneration Units
Erection of container type 2 Set CAT 3512 gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Kazakistan
Year: 2003
Hurricane Cogeneration Units
Erection of container type 2 Set CAT 3508 gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Kazakistan
Year: 2003
Tanrıverdi Tekstil Cogeneration System
Erection of 4 set CAT 3516B gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Çorlu / Tekirdağ – Türkiye
Year: 2003
Aktin Tekstil Cogeneration System
Erection of 4 set CAT 3520 gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Çorlu / Tekirdağ – Türkiye
Year: 2003
Saray Örme Tekstil Cogeneration System
Erection of 4 set CAT 3516B gas engine, manufacture and erection of heat recovery system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Bursa – Türkiye
Year: 2003
Dost İnşaat Tekirdağ Şehir Hastanesi Trigeneration System
3 set MTU 16V4000L64 2024 ekW gas engine, manufacture and erection of heat recovery system and absorption chiller cooling system.
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Tekirdağ – Turkey
Year: 2019
Rönesans İnşaat İkitelli Şehir Hastanesi Trigeneration System
4 set MTU 20V4000L64 2535 ekW and 1 set MTU 16V4000L64 2024 ekW gas engine, manufacture and erection of heat recovery system and absorption chiller cooling system.
Client: YANMAR TÜRKİYE MAKİNE ANONİM ŞİRKETİ
Location: İstanbul – Turkey
Year: 2019
YDA İnşaat Kayseri Şehir Hastanesi Trigeneration System
Erection of 2 Set MWM CG170-20 gas engine, manufacture and erection of heat recovery system and absorption chiller cooling system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Kayseri – Türkiye
Year: 2018
YDA İnşaat Manisa Eğitim ve Araştırma Hastanesi Trigeneration System
Erection of 2 Set MWM CG132-12 gas engine, manufacture and erection of heat recovery system and absorption chiller cooling system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Manisa – Türkiye
Year: 2018
Bilkent Entegre Sağlık Kampüsü Trigeneration System
Erection of 4 Set CG260-16 4300 gas engine, manufacture and erection of heat recovery system and absorption chiller cooling system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Ankara – Türkiye
Year: 2016
Bursagaz Trigeneration System
Erection of 1 Set MAN E2876 E312 gas engine, manufacture and erection of heat recovery system and absorption chiller cooling system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Bursa – Türkiye
Year: 2016
Ankamall AVM Trigeneration System
Erection of 3 Set MTU 20V4000L 2145 ekW gas engine, manufacture and erection of heat recovery system and multi chiller cooling system. Erection of heating and cooling lines between trigeneration plant and heat centers
Client: MTU MOTOR TÜRBİN A.Ş.
Location: Ankara – Türkiye
Year: 2015
Fatsa Devlet Hastanesi Trigeneration System
Erection of 2 Set MWM CG132-08 400 ekW gas engine, manufacture and erection of heat recovery system and absorption chiller cooling system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Fatsa / Ordu – Türkiye
Year: 2015
Timsah Arena Trigeneration System
Erection of 1 Set CAT 3512E 1200 ekW gas engine, manufacture and erection of heat recovery system and absorption chiller cooling system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: Bursa – Türkiye
Year: 2015
Sabiha Gökçen Havalimanı Trigeneration System
Erection of 2 Set CAT 3520C gas engine, manufacture and erection of heat recovery system and absorption chiller cooling system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İstanbul – Türkiye
Year: 2009
TESCO Kipa Trigeneration System
Erection of container type 2 Set CAT 3516B gas engine, manufacture and erection of heat recovery system and absorption chiller cooling system
Client: BORUSAN GÜÇ SİSTEMLERİ A.Ş.
Location: İzmir – Türkiye
Year: 2008
MMK Atakaş Metalurji Energy Plant
Erection of Taurus 70 gas turbine, heat recovery system and waste heat recovery boiler.
Client: SEGÜ MÜHENDİSLİK A.Ş.
Location: Kocaeli – Türkiye
Year: 2011
Delta Energy Waste Heat Recovery Boiler Erection
Erection of SG8 Type waste heat recovery boiler
Client: SEGÜ MÜHENDİSLİK A.Ş.
Location: Lüleburgaz – Türkiye
Year: 2009
Kasar Dual Tekstil Energy Plant
Erection of Taurus 60 gas turbine, heat recovery system and waste heat recovery boiler
Client: SEGÜ MÜHENDİSLİK A.Ş.
Location: Çorlu / Tekirdağ – Türkiye
Year: 2008
Altınmarka Gıda Energy Plant
Erection of M50 gas turbine, heat recovery system and waste heat recovery boiler
Client: SEGÜ MÜHENDİSLİK A.Ş.
Location: İstanbul – Türkiye
Year: 2008
Hayat Kağıt Energy Plant
Erection of Taurus 70 gas turbine, heat recovery system and waste heat recovery boiler
Client: SEGÜ MÜHENDİSLİK A.Ş.
Location: Çorum – Türkiye
Year: 2004
Besler Gıda Waste Heat Recovery Boiler Erection
Erection of waste heat recovery boiler
Client: SEGÜ MÜHENDİSLİK A.Ş.
Location: İstanbul – Türkiye
Year: 2002
Can Tekstil Energy Plant
Erection of Taurus 60 gas turbine, economizer and waste heat recovery boiler
Client: SEGÜ MÜHENDİSLİK A.Ş.
Location: Çorlu / Tekirdağ – Türkiye
Year: 2000
Zorlu Enerji A.Ş. Energy Plant
Erection heat recovery system
Client: SEGÜ MÜHENDİSLİK A.Ş.
Location: İstanbul / Bursa – Türkiye
Year: 1998
Maspo Alaşehir Geothermal Power Plant
Production of 1063 m³ capacity Fire Tank
Client: Maspo
Location: Manisa – Turkey
Year: 2019
Petro Peru Rafinerie de Talara
Pipe connections between waste heat recovery boiler and evaporator, documentation of ASME MDR. Inside piping of reactor
Client: SEGÜ MÜHENDİSLİK A.Ş.
Location: Talara – Peru
Year: 2018
Söktaş Tekstil
Piping of washing machines, manufacture of boiler room condensate tank and general piping
Client: ASMAŞ AĞIR SANAYİ MAKİNALARI A.Ş.
Location: Aydın – Türkiye
Year: 2009-2010
Tarkim Kimya Proses Lines
Erection of process pipelines
Client: SEGÜ MÜHENDİSLİK A.Ş.
Location: Bursa – Türkiye
Year: 2008
Eren Tekstil Energy Plant
Erection of 4 sets water heater
Client: SEGÜ MÜHENDİSLİK A.Ş.
Location: Corlu / Tekirdag – Turkey
Year: 2007
EÜAŞ Tunçbilek Plant
Installation of sand filter rehabilitation of water preparation system
Client: SEGÜ MÜHENDİSLİK A.Ş.
Location: Kütahya – Türkiye
Year: 2006
Kroman Çelik A.Ş.
Erection and piping of water box (135 ton)
Client: ASMAŞ AĞIR SANAYİ MAKİNALARI A.Ş.
Location: Kocaeli – Türkiye
Year: 2006
İskenderun Demir Çelik
Manufacture of segment, erection of machine and piping of cooling water
Client: ASMAŞ AĞIR SANAYİ MAKİNALARI A.Ş.
Location: İskenderun – Türkiye
Year: 2006